MAPEI PRIMER SN
Description
Product Overview
Mapei Primer SN is a high-performance, two-component epoxy primer formulated with fillers to provide excellent pore sealing, surface consolidation, and adhesion on cementitious substrates.
Its viscous, filled formulation allows it to effectively seal porous surfaces while strengthening weak or dusty substrates, creating a solid and uniform base for subsequent coatings and systems.
Primer SN is commonly used as a preparatory layer for epoxy and polyurethane flooring systems, as well as for self-levelling cementitious toppings. It can also be broadcast with quartz sand to create a mechanical key for levelling compounds and coatings.
It may be applied on slightly damp substrates (non-rising moisture), making it a versatile solution for industrial and commercial flooring applications.
Key Features
- Two-component epoxy primer with fillers
- Excellent pore sealing and substrate consolidation
- High adhesion to cementitious substrates
- Can be applied on locally damp substrates
- Ideal base for epoxy and polyurethane systems
- Compatible with cementitious levelling compounds
- Can be sand broadcast for mechanical key
- Low VOC formulation
Applications
- Priming concrete and cementitious screeds
- Preparation before epoxy and polyurethane coatings (Mapefloor systems)
- Base layer for self-levelling cementitious toppings (e.g. Ultratop)
- Substrate consolidation for weak or porous surfaces
- Surface sealing prior to flooring system installation
- Broadcast systems requiring mechanical key
Notes
- Mix components A and B at an 80:20 ratio until uniform
- Apply to clean, sound, and properly prepared substrates
- Pot life approximately 30 minutes
- Apply using a smooth or flat trowel
- Broadcast quartz sand into wet primer if required
- Allow minimum 12 hours before overcoating (depending on system)
- Protect from moisture and condensation during curing
Technical Information
| Specification | Details |
|---|---|
| Product Type | Two-component fillerised epoxy primer |
| Mixing Ratio | 80 : 20 (Part A : Part B) |
| Consistency | Viscous fluid |
| Colour | Neutral |
| Pot Life | Approx. 30 minutes |
| Dust Dry | Approx. 6 hours |
| Foot Traffic | Approx. 24 hours |
| Full Cure | 7 days |
| Application Temperature | +8°C to +35°C |
| Consumption | 0.3–0.7 kg/m² per coat |
| Application | Smooth or flat trowel |
| Packaging | 5kg and 20kg kits (A+B) |











