ULTRABOND TURF PU 1K
Description
Product Overview
Mapei Ultrabond Turf PU 1K is a high-performance, moisture-curing polyurethane adhesive developed specifically for synthetic turf systems.
Designed for bonding jointing strips between artificial grass panels, it provides a strong, elastic bond capable of withstanding movement, weather exposure, and heavy use.
This one-component adhesive requires no mixing or hardener, making it easy to use on-site while eliminating application errors associated with two-part systems.
Ultrabond Turf PU 1K offers excellent ridge stability, minimal expansion during curing, and strong adhesion to turf backings and seam tapes, making it ideal for both landscaping and professional sports installations.
Key Features
- One-component – ready to use, no mixing required
- Moisture-curing polyurethane adhesive
- Designed specifically for synthetic turf seams
- Strong, elastic bond for movement and durability
- Excellent ridge hold and dimensional stability
- Very low expansion during curing
- Suitable for indoor and outdoor applications
- Solvent-free with low odour
Applications
- Bonding jointing strips between synthetic grass panels
- Seaming artificial turf using joint tape systems
- Sports fields and athletic surfaces
- Commercial and residential landscaping projects
- Indoor and outdoor artificial grass installations
Notes
- Apply to clean, dry, and properly prepared substrates
- Spread adhesive evenly onto jointing tape using notched trowel
- Install turf within open time (approx. 80–100 minutes)
- Ensure full contact between turf backing and adhesive
- Apply weight along seams if required for proper bonding
- Allow approx. 12 hours before light foot traffic
- Full service conditions achieved after approx. 7 days
Technical Information
| Specification | Details |
|---|---|
| Product Type | One-component polyurethane adhesive |
| Curing Mechanism | Moisture-curing |
| Consistency | Creamy paste |
| Colour | Green |
| Open Time | 80–100 minutes |
| Foot Traffic | Approx. 12 hours |
| Full Cure | Approx. 7 days |
| Consumption | Approx. 0.30–0.35 kg per metre of joint strip |
| Application | Notched trowel |
| Packaging | 15kg drums, 600ml cartridges |












